top of page
conduit architecture + design

Celina Fire Station  No. 4

Celina Fire Station No. 4 is a 13,400 square-foot facility designed to enhance emergency services in the community. The station features three drive-through apparatus bays, ten dorm rooms, support areas, and a potential attached training tower. Built with resilience in mind, the facility includes a 100% generator backup system, an on-site fueling station, and an ICC500-compliant storm shelter. conduit architecture+design is leading the architectural efforts, providing comprehensive services from initial programming through construction administration. The project will result in a state-of-the-art fire station, designed for durability and operational efficiency.

 

Celina Fire Station No. 4 is currently in the Construction Documents phase.

@2025 Conduit architecture + design, LLC. All Rights Reserved

bottom of page